Installing the new gateposts Two nice 4" x 96" angle irons from the ATT cell tower leftovers
Digging with Valhalla backhoe
Set in poured concrete holes
Finished farm gate with Router Signs
Menzel Lake super 1.5" minus crushed gravel
Made a nice road out to the end
Checking out the landing with the leftovers
Dragging the road free of potholes from the logging equipment
Back to Valhalla Tree Farm