Installing
the Bridge |
|
Getting the shelf ready for the western abutment
|
Placing the western abutment |
Prepping the east side of the bridge
|
Placing the eastern abutment |
Tim Hart looking at the final alignment
|
Getting everything lined up
Two large shovels manage to dance around each other
|
Conference before finalizing the eastern abutment.
The bridge had to have a slight downward angle to avoid puddling of
water.
L-R Justin, Tim Hart, Jim Murphy, Jake
|
Everything is finalized.
Note the "norsk hytte" cabin upper left
|
Removing the wheels |
Building the west approach
|
Driving across for the first time |
Eric and his dump truck adding some fines to the east
side
|
Adding a topping to the east rise.
This was nice 4" mixed asphalt and concrete used on all of the new
roads.
We felt that some of this must be from the
seattle
viaduct |
View time lapse videos of the three
day operation
Day1
Day 2
Day 3
|
|
|
Return to Flatcar Bridge
Unloading and Moving the Bridge
Return to Harvest
Tree Farm Home