Garage
/ Apartment Project 2009-2012
Here is a project to build a two car garage, shop
and art studio with a small accessory apartment
underneath built into a side hill below the garage.
It would have stunning views of the cliffs
on Deer Mountain.
Here is the project story as it unfolds...
![]() Project complete Kitchen for the 800SF apartment June 2013 |
![]()
Here's the garage as you come up the driveway. All Ext Lights on photocell
and dimmed for effect |
![]() View from downhill |
![]() Fall 2011 |
![]() |
![]() |
Another drywall shot apartment lots of skylights | Drywall in the workshop/studio behind the garage |
![]() |
![]() |
Fall 2010 evening shot | Septic used a new system
called gravel less chambers Two lines 80 ft long |
![]() |
![]() |
Installing the wood stove in the shop/studio |
outside is to lockup |
![]() Shot from the North through woods |
![]() One of the garage bays Note doorway from garage into studio Bench will go on right |
![]() |
![]() |
![]() Garage Front October 2011 |
![]() Hardiboard going on |
s ![]() |
![]() Rough-in of the apartment |
![]() |
![]() |
PEX tubing for the hot and cold. Here's the runs to the kitchen. You just run this stuff like its wire |
Examining the bathroom plumbing rough-in End of September |
![]() Lower Front View |
![]() Framing of apartment coming together |
![]() Shot of the 2 Car Garage Front |
![]() Apartment framing from below grade Note the sonotube for the deck support in foreground |
![]() Workshop/Studio behind garage |
![]() Sideview of the building |
![]() Installing the PEX tubing for radiant heat over the 6x6 grid late August |
![]() We'll pour a 4" concrete slab and encase the tubing. The heat will consist of circulating 140 degree water through the tubes |
![]() Test Manifold pressurized and ready to pour the slab |
![]() Utility Ditch Note the 200 Amp conduit and telco, internet, gate control conduits |
![]() Shannon and Earl helping set R12 foam base for heated slab |
![]() In- Floor waste piping installed and inspected |
![]() Backfilling the upper wall |
![]() Backfilling the lower wall |
![]() Shot of the south side showing window well cutout. Note the downspout and perimeter drain piping going in. |
![]() Completed foundation |
![]() Shot of the new driveway spur on the left. Right side goes up to the cedar prowhouse. Note the cool rock that we dug up. |
![]() Clearing the lot The major tools shown. Stump fire, Trak-hoe and Transit |
|
|
This is the sketch from Architect Steve Peterson after we met and I explained what I wanted. We discussed my rough sketch
A
visit to the building site, a couple more meetings and Steve and I were
able to hammer out the rest of the building layout. It
included a shop space and bathroom in the garage and a generous 800 square
foot 2 bedroom Accessory Apartment below. This experienced
architect used his skills to fit the design into the
surrounding terrain and make it a truly "eye-popping" design. |
||
![]() Proposed Site Plan as sent to the county. |
||
|
||
Cedar House Security Gate Magneto Phone System Wifi System |
|
|
|
||
09-25-21 |