RECHECK PAGE LATER
Building the parallel road along creek Pulling a big cedar stump
Grading the edges
Dump truck on its way to the end note the old-growth stump on left Jordan Creek in ravine on right
Finishing up the end Flatcar bridge will go on a spur down to the right
Copyright © 2019 Valhalla Tree Farm. All rights reserved.
08/21/19B